Stage 2 of 5

Available

Pilot

A pilot is not a longer demo. It is a small group doing real work, with real consequences, for a fixed period, and then saying yes or no.

Length
2–4 weeks
People
3–8
Data
Real, current, not historic
Ends with
A written go / no-go

Set it up so it can fail

The most common way a pilot goes wrong is that nobody defined what failure looks like, so it drifts into a permanent half-adoption. Before the first day, write down the end date, the workflow, and the two or three things that must be true for this to be a yes.

Pick one workflow with a weekly heartbeat

Something the business does every week, so the pilot gets three or four repetitions rather than one.

Pick the team that owns it

The people who do the work, not a project committee. Three to eight is the range where everyone is accountable.

Enable only the modules that workflow needs

Plus Chat, always — the pilot needs somewhere for questions.

Use real, current data

This week's invoices, this week's leads, this quarter's project. Synthetic data hides the problems you are piloting to find.

Set the end date and put it in the calendar

A pilot without a date does not end, it fades.

app.erp.io/pm/projects
erp.io pilot

Ends 31 March · 4 people

BoardListTimeline
To do3
Connect Barclays feedPriya
Import client listSam
Draft invoice templateDana
In progress2
Week 2 reconciliationPriya · due Fri
First real work orderTom
Done4
Invite the pilot team
Enable 4 modules
Set fiscal year
A pilot tracked as a project in Projects, so the pilot itself demonstrates the product.

What to measure

MeasureHowA yes looks like
Did the work get done?Compare the pilot week to the same week in the old system.Same output, no heroics.
Did people use it unprompted?Read the audit log and the activity feed.Activity on days nobody was chasing.
How many workarounds appeared?Count the times somebody went back to a spreadsheet.One or two, each with a named reason.
What broke?A written list, not a feeling.Everything on it is either fixed, worked around, or accepted.
Would the team choose it?Ask them individually, not in the review meeting.They would.
Let the pilot team keep their workspace

When the pilot succeeds, do not start again in a clean organisation. The pilot organisation becomes the real one — the settings are already right and the pilot team are already the people who know how it is configured.

The two failure modes

Too many modules. A pilot that enables everything measures nothing, because attention splits and no single workflow gets four repetitions. Enable what the workflow needs.

Too little authority. If the pilot team cannot change the chart of accounts, the pipeline stages, or the project structure without asking, they will conform their work to the defaults and you will learn nothing about fit. Give them an administrator between them.

What this does not do

No pilot-specific pricing

A pilot runs on the ordinary trial. If it needs to run longer than 30 days, ask.

No sandbox to throw away

There is no separate test tenant. A disposable second organisation is the closest equivalent.

No rollback of a module

Turning a module off retains its data but there is no snapshot-and-restore.

Questions

Can a pilot run alongside our current system?

For the pilot workflow, yes, and it usually should. Full parallel running across the company is a different and heavier thing.

What if the pilot is a no?

Then it cost you three weeks instead of nine months, which was the point. Write down why — it is the most useful artefact the pilot produces.