Structures and BOMs

A bill of material is what the product is made of. Multi-level, comparable, and capturable as a baseline.

Levels
Multi-level
Compare
Two structures, side by side
Baselines
A snapshot in time
Variants
Supported

Building a structure

A BOM is a parent part with child parts and quantities, and children can themselves be assemblies with their own children. The structure is the product. Adding a part to an assembly changes every product that assembly appears in — which is why where-used matters before you edit.

app.erp.io/plm/structures
NW-1200 · Control unit

3 levels · 84 lines · baseline 2026-03-01

CompareBaseline
NW-1200 · Control unit1
204118 · Housing, upper, ABS1
204119 · Housing, lower, ABS1
NW-1210 · Main PCBA1
100248 · Resistor 10k 1% 060314
100612 · Capacitor 100n 040222
180044 · MCU, 48-pin1
311902 · Cable assembly 300mm1
420071 · Label, rating plate1
A multi-level bill of material. Sub-assemblies expand in place.

Compare

Comparing two structures — two variants, or the same product before and after a set of edits — produces the list of what differs. It is how you answer "what actually changed", which in the absence of change control is the closest the module gets to a change record.

CompareAnswers
Two variantsWhat is different about the export model.
A structure against its baselineWhat has drifted since the last snapshot.
Two baselinesWhat changed between two points in time.

Baselines

A baseline is a snapshot of a structure at a moment — what the product was when you shipped a batch, quoted a price, or sent a design out for manufacture. Without change control, baselines are the mechanism that makes a structure historically answerable at all, so take them at the points that matter.

A baseline is not an approval

Taking a baseline records a state. It does not gate anything, require a sign-off, or prevent further edits. If your process needs an approval before a design is released, that process lives outside this module today — see Changes.

  • Baseline before sending anything to a manufacturer.
  • Baseline when quoting, so a price can be tied to a specification.
  • Baseline at the end of a development phase, even if nothing formal happens.
  • Name baselines so a person can tell them apart. Dates alone stop being useful at about six.

What this does not do

No effectivity dates

A structure is current. There is no date-effective or serial-effective BOM.

No cost roll-up

Parts carry no cost, so a structure totals none.

No manufacturing BOM

One structure — the engineering view. There is no separate mBOM with process steps.

No approval gate

Anyone with the module can edit a released structure.

No export to an MRP

There is no standard interface out to a planning system.

Questions

How many levels are supported?

Enough for real products. Depth is not the constraint; discipline is.

Can a part appear twice in one assembly?

Yes, as separate lines — different reference designators, for instance.

Can we roll back to a baseline?

You can compare against one. There is no restore.